VILLA AMERICA - Cumbuco - Brazil

 

Project Description

LARGE PRIVATE VILLA INSIDE A RESIDENCE
TO BE CONSTRUCTED UPON REQUEST


  VILLA
AMERICA

 CUMBUCO

 FORTALEZA

LOCATION Cumbuco - Region of  Fortaleza
  TYPOLOGY Private Villa with 4 large bedrooms with en-suites
AVAILABILITY 
To be constructed upon request   BEACH DISTANCE 
Over the beach
FEATURES
Pool – Garden - security and monitoring 24H – Reception
  PRICE
320.000 Euro

Inside the stunning “Resort Summerville” of Cumbuco, that is positioned approximately 25 kms from Fortaleza, we are building upon request, the wonderful Villa America!

The Villa can be built within a period of eight months, on plot of land of approximately 1,000 sqm and with to a very high standard of quality. By request we can offer special flooring materials and the installations of solar energy

The Villa America, on the first floor, will have a large suite with elegant bathroom, closet, private study and enormous terrace with stunning views over the ocean.

On the ground floor, beside a large garage will have a huge living room, kitchen, bathroom and laundry and three large bedrooms with en-suites with stained glass windows overlooking the swimming pools.

On the external area beside the garden with tropical plants there will be a swimming pool for adults and another one for children, a large solarium in solid wood and an extended porch furnished with grill.

Villa America also provides the construction of a staff annex facility.

  • Why choose it:
  • -Villa for those that appreciate to live in comfort, as well as in large spaces
  • -Extraordinary location in front of Cumbuco beach
  • -Proximity to Fortaleza and its international airport
  • -High level of construction with high details care
  • -Views over the ocean
  • -Two swimming pools, Garden, solarium and support services
  • -Service of security ad monitoring 24H for 24H

Photos

 

Plant

 

Map


Visualizza Cumbuco - Villa Brazil in una mappa di dimensioni maggiori

Work Stage

 

The villa is built on demand and the work will require about eight months for its construction